acceptance criteria
Also called: acceptance criterion
Checkable conditions agreed in advance that a specific deliverable must meet before someone accepts it. "Good lessons" is a wish; "every topic has a worked example and ten graded practice tasks" is a criterion.
Acceptance criteria are checkable conditions, agreed before the work starts, that one specific deliverable must meet before someone accepts it. "Good lessons" is a wish: the people doing the work can't aim at it, and nobody can turn it down without a fight. "A random sample of 20 tasks has no factual errors" is a criterion.
Three things make a criterion work. A named acceptor runs it: the expert who can judge the work or the person who will rely on it, not the person who built it. A method comes with it: a sample, a test purchase, a pilot with a few users. A check without a way to run it is still a wish. And a failure rule is agreed in advance: what happens when the sample finds an error, so nobody negotiates the bar under pressure.
Small checks are smoke tests, not proof. Three pilot users agreeing with an expert catches a broken tool; it doesn't prove the tool is accurate. Write that limit into the criterion, and name where the real evidence will come from later.
Agree criteria before the work: written after delivery, they describe whatever was delivered. When something fails close to a deadline, decide openly: fix it, cut it, or accept it with a written exception that the sponsor signs. What you don't do is quietly lower the bar. Acceptance criteria are specific to one deliverable; the definition of done is the checklist that applies to every piece of work.
Example
Acceptance criteria for three deliverables of Klasna's physics launch, agreed in late October 2026:
The diagnostic test criterion carries its limit in writing: three learners is a smoke check that catches a broken test before launch, and placement accuracy will show only in the February data.
That data also shows what acceptance criteria can't do. The test passed "runs on a phone", yet in February 35% of the learners who started it on a phone finished it, against 64.71% on a computer. The criterion checked that the test worked; whether it worked well enough for families is a question for the success criteria.
Common mistakes
- Wishes instead of checks. "Engaging", "high quality" and "the CEO likes it" can't fail on a given day.
- The builder accepts their own work. The acceptor is the expert or the user, not the author.
- Criteria written after delivery. They end up describing whatever was delivered.
- No rule for a failed check. Agree up front what happens when the sample finds an error.
- A smoke check read as proof. Three pilot users catch a broken tool; they don't prove it's accurate.
Learn it in the course
- Acceptance criteria: what "done" means · "Good lessons" is a wish nobody can accept. Write checks a named person can run, agree them before the work starts, and say what happens when one fails.
- Risk responses, the pre-mortem and built-in quality · Choose a response for each risk (avoid, transfer, reduce, accept or escalate), use opportunities, find hidden risks with a pre-mortem, and check quality while the work is done, not at the end.
- Build, buy or hire: contracts by how clear the scope is · Decide per piece of work, pick a fixed price or time and materials by how clear the scope is, write a short request for proposals and pay for accepted work.
- Must, should, could: cut scope, not the date · When the list is longer than the time, sort every deliverable with one test, agree in advance what is dropped first, and keep the fixed date.
- Acceptance and handover to operations · Run the acceptance checks against the real thing, write known problems down with owners, hand each part to an everyday owner and keep a runbook for outages and alerts.